Disneyland Hotel Anaheim 2010
client: The Walt Disney Company
location: Anaheim, California
The Never Land Pool will receive a complete cosmetic makeover but will retain its unique shape. A new, four-foot deep pool will be built between the Never Land Pool and the water play area. A footbridge will stretch over this new pool, connecting both sides of the courtyard area and giving easy access across the property. Six new cabanas will also be added.
“Disneyland” will be spelled out in familiar blocks atop a platform supporting two huge water slides (the larger slide will be 26 feet high and will stretch 187 feet before it plunges into a splash pool below). Reminiscent of the original Monorail station at the Disneyland Hotel, at each slide’s entrance will sit a replica Monorail Car that guests will glide through as they twist and turn their way to the pool below. The pool will also feature a third, two-lane mini slide, perfect for little ones, which is just three and a half feet high and is 19 feet long.


